Case Study
Magnor Plant Complies To Health And Safety Standards And Reduces Inspection Times By 70%
As part of the Morgan Est group, Magnor Plant is responsible for carrying out a thorough examination of every piece of equipment across all of the group's construction sites on a rolling biannual basis.
Sites can be up and running from anything from two or three weeks to six years. With as many as 6000 pieces of equipment on each site, undertaking these examinations is not easy.
"In the old days we'd carry out a manual inspection and, upon return from site, begin the arduous task of rekeying all the information into our mainframe system," says Stuart Faulkner, Safety Equipment Manager at Magnor. "We needed a way to reduce paperwork. Post-inspection administration and time spent rekeying data was getting out of hand: inputting up to 30 pages of results could take three or four days to complete, which then meant a delay of up to two weeks getting the final inspection report back to site."
The content you requested is only available to registered users of Data Collection Online. By registering now, you'll get exclusive access to this piece of content and thousands of addtional articles and product reviews across our entire network of sites.



